US 19 Repaving from Drew Street to Sunset Point Road 443780-1-52-01
Project Details
Work Type | Repaving |
---|---|
Phase | Design |
Limits | US 19 from south of Drew Street to north of Sunset Point Road |
Length | 2 miles |
City | |
County | |
Road | |
Design Cost | $769,000 |
About
This project will repave US 19, the ramps and the frontage roads between Drew Street and Sunset Point Road in Clearwater.
The project is currently being designed. Construction is anticipated to begin in 2024.
View Factsheet
Contact Information
Design Manager |
---|
Danielle Intriago
813-975-6176
danielle.intriago@dot.state.fl.us
|
Media Contact |
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
|
Lane Closures
- There are no lane closures at this time.