Clearwater All Current Projects
- 437553-1-52-01
- Alt US 19 (N Myrtle Avenue) railroad crossing replacement between Hart Street and Maple Street
- 437805-1-52-01
- I-275 and US 19 Highway Lighting Upgrades in Pinellas County
- 452125-1-52-01
- SR 586 (Curlew Road) Drainage Improvements from Countryside Boulevard to Tampa Road
- 445681-1-52-01
- SR 590 (Drew Street) Repaving from Osceola Avenue to US 19
- 447918-1-52-01
- SR 60 (Gulf to Bay Boulevard) Resurfacing from east of Old Coachman Road to Dr Kiran Patel Boulevard
- 454711-1
- SR 60 Corridor Study from Shore Drive to Rocky Point Drive
- 437498-1-52-01
- SR 60 Courtney Campbell Causeway Pedestrian Overpass
- 455192-1
- SR 60/Courtney Campbell Causeway PD&E Study
- 254677-6-17
- SR 688 (Ulmerton Road) from 49th Street to I-275 Lighting Retrofit
- 256774-3-52-01
- US 19 New Interchanges and Roadway Improvements from SR 580 to the north of CR 95
- 456054-1-52-01
- US 19 Repaving from 49th Street to SR 580 (Main Street)