SR 60 Corridor Study from Shore Drive to Rocky Point Drive 454711-1
Project Details
Work Type | Corridor Study |
---|---|
Phase | Study |
Limits | SR 60 from Shore Drive to Rocky Point Drive |
Length | 7.8 miles |
City | |
County | |
Road |
About
The Florida Department of Transportation (FDOT) District Seven is conducting the State Road 60 Corridor Study to evaluate travel time reliability for vehicular travel, enhance multimodal access and connectivity, and safety improvements in Pinellas County, Florida.
The Study will also analyze options to improve the SR 60 at Belcher Road intersection.
View Factsheet
Contact Information
Study Manager |
---|
Eyra Cash
813-975-6164
Eyra.Cash@dot.state.fl.us
|
Media Contact |
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
|
Closures
- There are no closures at this time.