EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type Corridor Study
Phase Study
Limits SR 60 from Shore Drive to Rocky Point Drive
Length 7.8 miles
City
County
Road
About

The Florida Department of Transportation (FDOT) District Seven is conducting the State Road 60 Corridor Study to evaluate travel time reliability for vehicular travel, enhance multimodal access and connectivity, and safety improvements in Pinellas County, Florida.

 

The Study will also analyze options to improve the SR 60 at Belcher Road intersection.

View Factsheet
Contact Information
Study Manager
Eyra Cash
813-975-6164
Eyra.Cash@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
Closures
  • There are no closures at this time.