SR 60 Corridor Study from Shore Drive to Rocky Point Drive 454711-1
Project Details
| Work Type | Corridor Study | 
|---|---|
| Phase | Study | 
| Limits | SR 60 from Shore Drive to Rocky Point Drive | 
| Length | 7.8 miles | 
| City | |
| County | |
| Road | 
About
The Florida Department of Transportation (FDOT) District Seven is conducting the State Road 60 Corridor Study to evaluate travel time reliability for vehicular travel, enhance multimodal access and connectivity, and safety improvements in Pinellas County, Florida.
The Study will also analyze options to improve the SR 60 at Belcher Road intersection.
	
	
	
	
	
	View Factsheet
	
		
								
						
												
						
						
                
                        
						
             
			
						
				
		
		
		
		
		
		
		
		
            Contact Information
| Study Manager | 
|---|
| Eyra Cash 813-975-6164Eyra.Cash@dot.state.fl.us | 
| Media Contact | 
| Kris Carson 813-975-6060Kristen.Carson@dot.state.fl.us | 
Closures
- There are no closures at this time.
 FDOT Emergency Travel Alert: For information on the current situation, please visit the following
            page -
            FDOT Emergency Travel Alert: For information on the current situation, please visit the following
            page -  
