SR 60 All Current Projects
- 452951-1
- Plant City Transportation Talks
- 451997-1-52-01
- S.R. 60 (E. Adamo Drive) Resurfacing from east of N. 22nd Street to east of U.S. 41
- 448934-1-52-01
- SR 60 (Adamo Drive) from west of N 34th Street to east of N 34th Street
- 453420-1-32-01
- SR 60 (Adamo Drive) Intersection Improvements at Maydell Drive
- 450828-1-52-01
- SR 60 (Adamo Drive) Intersection Improvements at US 301
- 451454-1-52-01
- SR 60 (Brandon Boulevard) Resurfacing from east of Grand Regency Boulevard to east of Buckingham Place
- 451455-1-52-01
- SR 60 (E Brandon Boulevard) Resurfacing from east of Lithia Pinecrest to west of Valrico Road
- 447918-1-52-01
- SR 60 (Gulf to Bay Boulevard) Resurfacing from east of Old Coachman Road to Dr Kiran Patel Boulevard
- 435750-2-52-01
- SR 60 (Hopewell Road) Widening from Dover Road to SR 39
- 436489-1-52-01
- SR 60 (Kennedy Boulevard) Repaving from Woodlynne Avenue to Brevard Avenue
- 454711-1
- SR 60 Corridor Study from Shore Drive to Rocky Point Drive
- 437498-1-52-01
- SR 60 Courtney Campbell Causeway Pedestrian Overpass
- 441662-1-32-01
- SR 60 Repaving from Buckingham Place to Lithia Pinecrest Road
- 443426-1-52-01
- SR 60 Repaving from SR 39 to Clarence Gordon Jr Road
- 450337-1-52-01
- SR 60 Repaving from west of Ben T Davis Beach to east of Bayport Drive
- 435750-1-52-01
- SR 60 Widening from Valrico Road to Dover Road
- 455192-1
- SR 60/Courtney Campbell Causeway PD&E Study
- 447107-2-32; 447107-2-52; 447107-3-52; 447107-4-52
- Tampa’s Westshore Interchange (I-275/SR 60) Safety and Operational Improvements