US 98 Construction Projects
- 437515-1-52-01
- US 19/US 98 (N Suncoast Boulevard) Repaving from south of NE 1st Terrace to south of Snug Harbor Road
- 443368-3-52-01
- US 98 Widening and Realignment from the Polk County line to US 301
- 436673-1-52-01
- US 98 Widening from W Socrum Loop Road to CR 54
- 447237-1-52-01
- US 98/SR 50 at Mondon Hill Road / Spring Lake Highway