SR 60 from W of Clearwater Harbor Channel to Memorial Causeway Bridge 441651-1-52-01
Project Details
Work Type | Resurfacing |
---|---|
Phase | Design |
Limits | From West of Clearwater Harbor Channel to the Memorial Causeway Bridge |
Length | 1.2 miles |
City | |
County | |
Road | |
Design Cost | $927,875 |
About
This project will repave SR-60 (Memorial Causeway) between the Clearwater Harbor Channel and the Memorial Causeway Bridge in Clearwater.
This project is currently being designed.
Construction is anticipated to begin in 2024.