All Design Projects
- 256422-2-52-02
- US 301 Widening and Realignment from SR 39 to south of CR 54
- 411328-1-52-01
- US 41 (Melburne Boulevard) Resurfacing from west of N 50th Street to 40th Street
- 452924-1-32-01
- US 41 (N. Broad St) Intersection Improvements at SR 50A (Jefferson St.)
- 439459-1-52-01
- US 41 (Nebraska Avenue) Intersection Improvements at E Chapman Road
- 403716-1-52-01
- US 41 (Nebraska Avenue) Resurfacing from Kennedy Boulevard to Hillsborough Avenue
- 450972-1-52-01
- US 41 (S Florida Avenue) Sidewalk Improvements from south of E Stage Coach Trail to south of E Tower Trail
- 458349-1-52-01
- US 41 (SR 45) Intersection Improvements at SR 54
- 447935-1-52-01
- US 41 (SR 45) Resurfacing from south of County Line Rd. to south of Powell Rd.
- 454840-1-52-01
- US 41 (SR 45) Widening from north of SR 52 to south of CR 576
- 449157-1-52-01
- US 41 / N Broad Street Repaving from north of Jefferson Street to south of Turkey Trot Lane
- 257165-5-52-01
- US 41 Widening from N of Sportsman Point to E. Arlington Street
- 430056-2-52-01
- US 41 Widening from Pendola Point/Madison Avenue to Denver Street
- 257165-4-52-01
- US 41 Widening From S of Withlacoochee Trail Bridge to N of Sportsman Point
- 447919-1
- US 92 (4th Street N) Repaving from 3rd Street N to 30th Avenue N
- 450338-1-52-01
- US 92 (Baker Street) Resurfacing from east of Park Road to County Line Road
- 458144-1-52-01
- US 92 (Dale Mabry Highway) Intersection Improvements at Steinbrenner Drive
- 451989-1-52-01
- US 92 (Dale Mabry Highway) Pavement Rehabilitation from north of Kennedy Boulevard to north of West South Avenue
- 451238-1-52-01
- US 92 (Gandy Boulevard) Resurfacing from Brighton Bay Boulevard to Gandy Bridge
- 447156-1-52-01
- US 92 (Hillsborough Avenue) at CR 579 (Mango Road) Intersection Improvements
- 446271-1-52-01
- US 92 (Hillsborough Avenue) Resurfacing from east of Sheldon Road to east of Benjamin Road