All Design Projects
- 443666-1-52-01
- SR 699 (Gulf Boulevard) Repaving from 191st Avenue to SR 688 (5th Avenue N)
- 451374-1-52-01
- Tomlin Middle School Sidewalks
- 450545-1-52-01
- U.S. 41 (S.R. 45) Pavement Reconstruction at S.R. 44
- 446025-1-52-01
- U.S. 92 (Baker Street) Resurfacing from N Gordon Street to Thonotosassa Road
- 450971-1-52-01
- US 19 (Commercial Way) Sidewalk Improvements from Applegate Drive to Trenton Avenue
- 443707-1-32-01
- US 19 (SR 55) Drainage Repair from north of Flora Avenue to south of Fivay Road
- 254677-2-52-94
- US 19 (SR 55) Median Safety Improvements
- 447522-2-52-01
- US 19 (SR 55) Pedestrian Safety Improvement from south of Tudor Lane to north of Tudor Lane
- 435914-2-52-01
- US 19 Interchange Improvement at SR 694 (Gandy Boulevard/Park Boulevard)
- 433799-1-52-01
- US 19 New Interchanges between CR 95 and Pine Ridge Way S
- 433796-1-52-01
- US 19 New Interchanges between Timberlane Road and Lake Street
- 433797-1-52-01
- US 19 New Interchanges from Nebraska Avenue to Timberlane Road
- 447928-1-52-01
- US 19 Resurfacing from north of NW 7th Ave to south of the Withlacoochee River bridge
- 450970-2-52-01
- US 301 & SR 54 Sidewalk Improvements
- 408075-2-52-01
- US 301 (Gall Blvd) Widening from CR 54 (Eiland Blvd) to north of Kossik Rd
- 416564-2-52-01
- US 301 (Gall Blvd) Widening from SR 56 to SR 39
- 255796-3-52-01
- US 301 Reconstruction from Hillsborough/Pasco County Line to south of SR 56
- 255796-2-52-01
- US 301 Reconstruction from north of Tom Folsom Road to Hillsborough/Pasco County Line
- 447972-1-52-01
- US 301 Resurfacing from Balm Riverview Road to Lake Street Charles Boulevard
- 450968-1-52-01
- US 301 Sidewalk Improvements from Bloomingdale Avenue to Cresent Park Drive