Pasco County Construction Projects
- 454668-1-52-01
- I-75 at SR 52 Interchange Improvements
- 453551-1-52-01
- I-75 Florida Regional Advanced Mobility Elements (FRAME) from Hillsborough to Hernando counties
- 445507-4-52-01
- I-75, I-275, and I-4, Wrong-way Detection Installation in Hillsborough, Pasco and Pinellas counties
- 447951-1-52-01
- SR 39 Repaving from north of Central Avenue to US 301 (Gall Blvd.)
- 449316-1-52-01
- SR 52 Pedestrian Overpass for the Suncoast Trail
- 449315-1-52-01
- SR 54 Pedestrian Overpass for the Suncoast Trail
- 449169-1-52-01 & 449170-1-52-01
- SR 56 Resurfacing from Bruce B. Downs Blvd. to Meadow Pointe Blvd. and SR 581 (Bruce B. Downs Blvd.) Resurfacing from SR 56 to SR 54
- 254677-6-09
- US 19 Pedestrian Mid-Block Crosswalk at Charlene Lane in Pasco County
- 254677-6-23
- US 19 Pedestrian Mid-Block Crosswalk at Louis Avenue in Pasco County
- 455145-1-52-01
- US 301 at Wire Road -- New Traffic Signal
- 447536-2-52-01
- US 301 Widening from south of US 98 to SR 50 (Cortez Blvd)
- 254677-6-07
- US 41 (Land O’ Lakes Boulevard) New Traffic Signal at Lake Patience Road
- 256423-3-52-01
- US 98 (Dade City Bypass) Widening from 7th St. S. to 7th St. N.
- 443368-3-52-01
- US 98 Widening and Realignment from the Polk County line to US 301